20160408_154229 20160412_101239 20160422_115556 20160426_175325 20160501_210552 20160522_114101 20160524_133617 20160524_133648 20160623_115035 DSC_0056 DSC_0058 DSC_0062 DSC_0063-2 DSC_0063 DSC_0067 DSC_0069 DSC_0105 DSC_0125 DSC_0560 DSC_0678 DSC_2537 DSC_2555 DSC_2702 IMG_0134 IMG_0143 IMG_0161 IMG_0163 IMG_2730 IMG_3744.jpg-1

SKKL Fibre Optic Cable Route Survey

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simeulue-Bakongan-Banda Aceh – Sabang- Batam – Karimun from Telkom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.