Marine Fibre Optic Cable Route Survey for Palapa Ring Paket Barat Indonesia Total 1,700km
(PT Sarana Global Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Proposed Geophysical Survey For PDPT Pengerang Johor Malaysia (Jetty 2) Monthly Multibeam Survey Boat
(Penta Ocean Construction Co Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation & Positioning Services onboard “ASEAN PROTECTOR” & Anchor Handling Tug for APG Hong Kong and Sarawak Malaysia
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Pekerjaan Marine Survey Sistem Kominikasi Kabel Bawah Laut (SKKL) Total survey route covering 790 km from land fall to maximum 3,450 water depth
(PT Sarana Global Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Marine Fibre Optic Cable Route Survey for Palapa Ring Paket Barat Indonesia Total 1,700km
(PT Sarana Global Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Proposed Geophysical Survey For PDPT Pengerang Johor Malaysia (Jetty 2) Monthly Multibeam Survey Boat
(Penta Ocean Construction Co Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation & Positioning Services onboard “ASEAN PROTECTOR” & Anchor Handling Tug for APG Hong Kong and Sarawak Malaysia
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Pekerjaan Marine Survey Sistem Kominikasi Kabel Bawah Laut (SKKL) Total survey route covering 790 km from land fall to maximum 3,450 water depth
(PT Sarana Global Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


NSRP Project/ Barge Positioning Survey & Touchdown Monitoring Survey & Post Construction Survey

Navigation & Positioning Services onboard “ASEAN Protector” & Anchor Handling Tug for Proposed New Cable Installation Porject in Papua Irian Indonesia (Sulawesi Papua Cable System) SMPCS Project.


Navigation & Positioning Services onboard “ASEAN Protector” & Anchor Handling Tug for Proposed New Cable Installation Porject in Papua Irian Indonesia (Sulawesi Papua Cable System) SMPCS Project.
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


NSRP Project/ Barge Positioning Survey & Touchdown Monitoring Survey & Post Construction Survey in Vietnam
(Hyundai Heavy Industries Co.)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation & Positioning Services onboard “ASEAN PROTECTOR” & Anchor Handling Tug For Proposed New Cable Installation Project in Indonesia
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Bathymetry Survey Services at North Madura, Indonesia

Navigation & Positioning Services onboard “ASEAN PROTECTOR” & Anchor Handling Tug For Proposed New Cable Installation Project in Indonesia

Proposed Geophysical Survey For PDPT Pengerang Johor Malaysia (Jetty 2) Monthly Multibeam Survey Boat)


Bathymetry Survey Services at North Madura, Indonesia
(CGG Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Pekerjaan Freespan Correction (ROV)
(PT Sarana Global Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


B.Oceania Salvage Project

Hydrographic Survey, Barge Positioning & Cathodic Protection Survey Works

Navigation and Positioning Survey Services for Cable Installation Work In Indonesia

Hydrograhic & Seismic Survey for Proposal Terminal At Pulau Janda Berias Batam Riau Indonesia

Pipeline Route Pre Installation Survey for PT Timas Balongan Pipeline Project Ceribon Indonesia

Pekerjaan Freespan Correction (ROV)


Hydrographic Survey, Barge Positioning & Cathodic Protection Survey Works
(Leighton Offshore/ Leighton Engineering Construction JV)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


B.Oceania Salvage Project
(Mammoet (S)Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Pipeline Route Pre Installation Survey for PT Timas Balongan Pipeline Project Ceribon Indonesia
(Leighton Offshore)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Hydrograhic & Seismic Survey for Proposal Terminal At Pulau Janda Berias Batam Riau Indonesia
(PT West Point Terminal)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation and Positioning Survey Services for Cable Installation Work In Indonesia
(PT Nusantara Perkasa)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Proposed Fiber Optic Cable Route Survey for MIC 2 Batam Singapore Network


Proposed Fiber Optic Cable Route Survey for MIC 2 Batam Singapore Network
(PT Ketrosden Triasmitra)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Independent Deepwater Petroleum Terminal in Pengerang, Johor, Malaysia EPC Contact for Site Preparation, Associated Works & Dredging
(Penta Ocean)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Seismic Boomer Survey Off Myanmar Water

“Independent Deepwater Petroleum Terminal in Pengerang, Johor, Malaysia
EPC Contact for Site Preparation, Associated Works & Dredging”

Navigation & Positioning Services For Submarine Pipeline Free Span Correction Survey at Sumatra Jawa Indonesia


Cable Installation & Cable Repair and Cable Route Survey
(2 Years Contract)
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation & Positioning Services For Submarine Pipeline Free Span Correction Survey at Sumatra Jawa Indonesia
(2 Years Contract)
(PT Sarana Global Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Chahaya Shipping & Trading
(Seismic Boomer Survey Off Myanmar Water)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation and Positioning Services for Submarine Pipeline Free Span Correction Survey at Thailand
(Cabaco Marine Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.

Multi Beam Echo Sounding Survey off West of Karimun
Barge Navigation and positioning survey services for Pembinaan Logi Air Beaufort Fasa II dan Pemasangan Paip Dasar Laut Logi ke Labuan Malaysia

Devil Creek Perth Australia Project

Navigation and Positioning Services for Submarine Pipeline Free Span Correction Survey at Thailand

Ship Wreck Survey Off Myanmar


Ship Wreck Survey Off Myanmar
(Singapore Salvage Engineers Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Devil Creek Perth Australia Project
(SapuraAcergy Sdn Bhd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Barge Navigation and positioning survey services for Pembinaan Logi Air Beaufort Fasa II dan Pemasangan Paip Dasar Laut Logi ke Labuan Malaysia
(Leighton Offshore Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Multi Beam Echo Sounding Survey off West of Karimun
(Oil tanking Asia Pacific Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation & Positiong services on board “Cable Protector” for Asia America Gateway Project, segment 1 and segment 2 cable systems installation, Hong Kong

Navigation and positioning services for SJJK Project in Surabaya, Indonesia

Vibro Coring survey services off South Thailand Coastal (70km2)

VSNL Intro- Asia Traffic Seperation Scheme – Cable Re-Route Survey 2009

“Cable Installation & Cable Repair and Cable Route Survey
(2 Years Contract)”


Vibro Coring survey services off South Thailand Coastal (70km2)
(Boskalis International Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation and positioning services for SJJK Project in Surabaya, Indonesia
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation & Positiong services on board “Cable Protector” for Asia America Gateway Project, segment 1 and segment 2 cable systems installation, Hong Kong
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Karimun Yard Construction Project (Complementary Multibeam & Vibrocore Campaign)
(PT Saipem Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


KODECO Grisik Surabaya Indonesia Post Trenching Pipeline Project (Positioning Survey Services) on Board Easten Trencher Barge

Karimun Seismic Survey Sand Search

SBM Udang Field Offshore West Natuna, Indonesia

Karimun Yard Construction Project (Complementary Multibeam & Vibrocore Campaign)


SBM Udang Field Offshore West Natuna, Indonesia
(Alam Hidro Sdn Bhd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Karimun Seismic Survey Sand Search
(Boskalis International)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


VSNL-IA TSS TYCO Communication USA Fibre Optic Cable Pre Ruote Survey Singapore- Indonesia and Malaysia Water
Multi Beam Side Scan Sonar Seismic/ Vibro Corering (10 Nos
(TYCO Communications USA)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


KODECO Grisik Surabaya Indonesia Post Trenching Pipeline Project (Positioning Survey Services) on Board Easten Trencher Barge
(BCS Bay Sea Cable Systems)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Navigation and Positioning Services of AAGFibre Optic Cable Installation on Board “Cable Protector” Batam Indonesia to Changi Singapore
(Asean Cableship Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Batam (Indonesia) to Sungai Rengit (Malaysia) 68kilometre Fibre Optic Cable Route Survey. (Desk Top Study, Pre Engineering & Vibro Corering (70Nos), Installation and Post Installation Survey

Fabrication Yard Facilities Development Project at Batam / Karimun. Proposed Navigation Channel

Moratelindo Fibre Optic Cable, Batam,Indonesia to Singapore (Desk Top Study,Pre Engineering & Vibro Corering (78Nos),Installation and Post Installation Survey 67km Route


Moratelindo Fibre Optic Cable, Batam,Indonesia to Singapore (Desk Top Study,Pre Engineering & Vibro Corering (78Nos),Installation and Post Installation Survey 67km Route
(Global Marine Cable Systems Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Fabrication Yard Facilities Development Project at Batam / Karimun. Proposed Navigation Channel
(PT Saipem Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Batam (Indonesia) to Sungai Rengit (Malaysia) 68km Fibre Optic Cable Route Survey. (Desk Top Study, Pre Engineering & Vibro Corering (70Nos), Installation and Post Installation Survey
(Global Marine Cable Systems Pte Ltd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Total Fina Sisi Nubi Indonesia Post Trenching Pipeline Project (Positioning Survey Services) on Board ASL 27 Barge
(BCS Bay Sea Cable Systems)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Gas Transmission and Distribution Project West Jawa to Sumatra, Indonesia Phase 1 (Pre Hydrographic, Navigation & Positioning Services and As laid Pipeline Pingger Survey)

Pre Engineering, Inspection, Repair & Maintenance (R.O.V) Gas Pipeline West Natuna Ttasport System For M/s Conocophillips, Indonesia

Total – Fina Vietnam Wellhead Inspection and Cleanup Underwater Survey ( Positining R.O.V and Barge Management)

Total Fina Sisi Nubi Indonesia Post Trenching Pipeline Project (Positioning Survey Services) on Board ASL 27 Barge

PTT Third Transmission Pipeline Post Trenching & Backfilling 44”Pipeline Project at Thailand


PTT Third Transmission Pipeline Post Trenching & Backfilling 44”Pipeline Project at Thailand
(CP Link)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Total – Fina Vietnam Wellhead Inspection and Cleanup Underwater Survey
-Positining R.O.V and Barge Management-
(Alam Hidro Sdn Bhd)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Pre Engineering, Inspection, Repair & Maintenance (R.O.V) Gas Pipeline West Natuna Ttasport System For M/s Conocophillips, Indonesia
(PT Prata Dinamika)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Gas Transmission and Distribution Project West Jawa to Sumatra, Indonesia Phase 1
-Pre Hydrographic, Navigation & Positioning Services and As laid Pipeline Pingger Survey-
(BCS Bay Sea Cable Systems)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.


Barge Positioning System for Total Fina ELF Tunu Phase 9 Project, Samarinda Indonesia
(PT Puni Lloyd, Indonesia / Indonesia)

Geometra international was awarded Marine survey of Sistem Komunikasi Kabel Bawah Laut ( SKKL) Larantuka – Kalabahi – Atambua-Sibolga-Nias-Simauleu-Bakongan-Bandar Aceh – Sabang- Batam – Karimun from Telcom Indonesia. Total length of the Cable route survey was 758 kilometre covering 0.0 chart datum to 3,489.0 metre chart datum. The job was started 14th April 2016 for 56 days.

Barge Positioning System for Total Fina ELF Tunu Phase 9 Project, Samarinda Indonesia